Dholera TP scheme 3B: what the November 2025 preliminary sanction covers, and what it does not
Updated 11 November 2026. Compiled by the dholera.blog desk from the sources listed at the end of this page.
Preliminary Town Planning Scheme No. 3B was sanctioned by the Gujarat Infrastructure Development Board on 3 November 2025 under notification SIRAA/03/2025/001, for the villages of Panchi, Sangasar and Sandhida. It was approved subject to modifications in the schedule, and it is a preliminary scheme, not a final one. The sanction note gives no scheme area. Read 13 November 2026.
The three villages named in the 3B sanction
| Village | Census 2011 sub-district | Households (2011) | Population (2011) | Village area (hectares, 2011) | Notified SIR area (sq km, 2009) | Survey numbers (2009) |
|---|---|---|---|---|---|---|
| Sangasar | Barwala | 211 | 1,105 | 3,232 | 35.5 | 790 |
| Panchi | Dhandhuka | 226 | 1,197 | 1,417 | 14.0 | 360 |
| Sandhida | Dhandhuka | 216 | 985 | 1,864 | 18.6 | 517 |
Village figures, not the area of the scheme: the sanction note we read gives no scheme area, and scheme boundaries can cover only part of a village. Census 2011 and the 22 May 2009 SIR notification schedule.
Download this table (CSV). Last checked 11 November 2026. Free to quote with a link to this page.
What was sanctioned and when
A regulatory update dated 18 November 2025 reports that the Gujarat Infrastructure Development Board, acting as the Apex Authority, sanctioned Preliminary Town Planning Scheme No. 3B on 3 November 2025. The notification number is SIRAA/03/2025/001. The villages named are Panchi, Sangasar and Sandhida. The Apex Authority approved it subject to modifications set out in a schedule, and the update says the scheme grew out of draft Town Planning Scheme No. 3, which the Dholera Special Investment Region Development Authority prepared.
I read that report, not the notification itself. The notification text was not available to me today, so the details below stay at the level the report gives.
Where 3B sits in the Dholera scheme list
The Dholera SIR portal lists its town planning schemes in two groups. The preliminary group names 13 schemes: TP 2A, TP 4A, 1A1, 1A2, 2B1, 2B2, 2B3, 3A, 3B, 4B1, 5A, 5B and 6A. The draft group lists DTPS No. 1 to No. 6. The portal shows no final schemes. Scheme 3B is therefore one of 13 preliminary entries, and the page does not date each one. The portal page was last updated 24 August 2026 for the whole site, so it does not by itself show when 3B was added.
The three villages and their size
The table gives each village as it stood in the 2011 Census and in the 2009 SIR schedule. These are village figures. A scheme can cover only part of a village, and the report gives no area for 3B, so do not read the sq km column as the size of the scheme. Sangasar is the largest of the three at 35.5 sq km in the 2009 schedule. In the 2011 Census, Sangasar was counted under Barwala sub-district while Panchi and Sandhida were under Dhandhuka.
Draft, preliminary, final: what I can and cannot say
The portal's own grouping tells you the order of the labels: draft, preliminary, and no final entries yet. It does not set out what rights or rules attach to each stage, and I have not read that in a source I could open. So I will not tell you what 3B changes for a plot owner's title or tax. What I can say is that the portal's disclaimer points to the Maps and Reports section under the DSIRDA tab for scheme details, and that is where the 3B plan and its schedule should be requested.
The deduction question for 3B
The Gujarat Town Planning and Urban Development Act lets a scheme set aside land from its total area: 15 per cent for roads, 5 per cent for parks and open space, 5 per cent for social infrastructure and 15 per cent for sale by the authority, with a separate 10 per cent reservation for housing for weaker sections in section 40(3)(j). Our record of the sanction of draft scheme 3 on 24 October 2013 shows a direction to keep an average 50 per cent deduction. Whether the 2025 modifications changed that figure is not in anything I read, so I treat 50 per cent as unconfirmed for 3B.
What a buyer or owner should check
- Find your survey number and ask DSIRDA which scheme and which part of it covers the survey number.
- Ask for the original plot and final plot numbers in the 3B schedule.
- Ask for the modifications the Apex Authority attached to the sanction.
- Do not accept a brochure that calls 3B final, ready, or booked for development unless it names the notification.
The line only this site can add
Three villages are named in 3B, but all three also sit in the draft scheme 3 notification, so 3B can be read as a first slice of scheme 3 rather than a new area. Of the 22 villages, Panchi, Sangasar and Sandhida carry 3,287 people between them in the 2011 Census, small numbers beside the planned city.
What this page cannot tell you
This essay relies on one secondary report of the sanction and the portal's scheme list. It does not give the scheme area, the plot rules or the schedule of modifications, and it is not legal advice.
Questions people ask
What is Dholera TP scheme 3B?
Preliminary Town Planning Scheme No. 3B, sanctioned by the Gujarat Infrastructure Development Board on 3 November 2025 for Panchi, Sangasar and Sandhida villages, according to a regulatory update of 18 November 2025.
Is TP scheme 3B final?
No. It is listed as a preliminary scheme. The Dholera SIR portal shows no final schemes in its list.
Which villages are in Dholera TP 3B?
Panchi, Sangasar and Sandhida.
How big is TP scheme 3B?
Not stated in the sanction report I read. The village areas in the table are village figures, not the scheme area.
Does 3B still carry a 50 per cent deduction?
Not confirmed. The 50 per cent average was directed for draft scheme 3 in 2013. Ask DSIRDA for the 3B schedule.
Where do I get the 3B plan?
The Dholera SIR portal points to the Maps and Reports section under the DSIRDA tab for TP scheme details.
Read next
- Dholera TP3 explained
- Dholera TP schemes explained
- Final plot number explained
- The 22 villages question
- Which TP is best
Sources
- Regulatory update: GIDB sanction of Preliminary Town Planning Scheme No. 3B (notification SIRAA/03/2025/001) (sanction 3 November 2025, published 18 November 2025; read 13 November 2026)
- Dholera SIR portal, Town Planning Schemes list (preliminary and draft schemes) (site last updated 24 August 2026; read 13 November 2026)
- Dholera SIR portal, disclaimer: TP scheme details under Maps and Reports (read 13 November 2026)