Dholera developers ranked by months from project start to GujRERA registration

Updated 17 November 2026. Compiled by the dholera.blog desk from the sources listed at the end of this page.

On the GujRERA register read on 17 November 2026, 16 of the 33 registered Dholera projects were registered within three months of their declared start date. The shortest gap is two months, shared by 7 Oak Platinum 4, Aaiji Residency and Dholera Marigold 548 among others; the longest is 12 months, Fidato Luxuria 2. The median gap is 4 months.

  • 33registered projects compared
  • 2 monthsshortest gap between start and registration
  • 12 monthslongest gap
  • 4 monthsmedian gap
Check any developer here firstLook the company up on DholeraIntel's developer directory and read how to verify a Dholera developer before you pay. Then confirm the project's registration on the GujRERA portal and ask for the title papers of the exact plot. A place on this list records a public fact about a company. It is a starting point for your own checks.DholeraIntel is a sister publication of this site.
How this list is rankedRanked on one fact: the months between the project start date and the registration date on each project's GujRERA record, read on 17 November 2026. The registration date is the approval date printed on the record. Months are the days between the two dates divided by 30.44, rounded. All 33 projects have both dates, so none was dropped. Shortest gap first; ties share a rank and are ordered by promoter name.

Registered projects by months from start to registration

RankPromoter (as on the record)ProjectGujRERA numberVillageProject start dateRegistration dateGap (months)
17 OAK DEVELOPERS7 OAK PLATINUM 4PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07741/051220Kadipur ( Dholera )3 October 20205 December 20202
1AAIJI INFRA AND DEVELOPERSAAIJI RESIDENCYPR/GJ/AHMEDABAD/DHANDHUKA/AUDA/PAA09145/111021Not stated in the record24 August 202111 October 20212
1Bhaveshkumar C. Hakani Proprietor of C T CORPORATIONDHOLERA MARIGOLD 548PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07648/091120Kadipur19 September 20209 November 20202
1CHHABILDAS DEVELOPERS PRIVATE LIMITEDDHOLERA SKYPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07924/160121Not stated in the record5 November 202016 January 20212
1CUBE INFRASTRUCTURENEST 63PR/GJ/AHMEDABAD/AHMEDABAD CITY/Others/PAA10662/150922Not stated in the record15 July 202215 September 20222
1GAP ASSOCIATES PRIVATE LIMITEDGAP Industrial Park 1PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10173/EX1/030826/311226Not stated in the record14 March 202211 May 20222
1GAP STUDIOS LLPAakarPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/RAA15713/190825/311228Bhimtalav17 June 202519 August 20252
1GREENERA INFRAWELL PRIVATE LIMITEDGREENERA GARDENVILLA 2PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA11450/EX1/010925/300526Not stated in the record17 January 202314 March 20232
1GREENERA INFRAWELL PRIVATE LIMITEDGREENERA PRIME 2PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07841/311220Kadipur6 November 202031 December 20202
1PARV INFRACON LLPSHANTIBAN DREAMSPR/GJ/AHMEDABAD/AHMEDABAD CITY/Dholera Special Investment Region Development Authority/MAA11736/A1M/281026/311228DHOLERA2 March 20238 May 20232
1Shyam InfraDholera IconicPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/CAA16655/010426/310330Mundi2 February 20261 April 20262
127 OAK DEVELOPERS7 OAK SMART CITYPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07929/180121Not stated in the record29 October 202018 January 20213
127 OAK DEVELOPERSPLATINUM 7PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA08002/030221Not stated in the record5 November 20203 February 20213
12CUBE INFRANEST 29PR/GJ/AHMEDABAD/DHANDHUKA/AUDA/PAA07781/161220Dholera28 September 202016 December 20203
12GREENERA INFRAWELL PRIVATE LIMITEDGREENERA GARDENVILLAPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07425/EX1/EX2/220825/301225Bhimtalav1 June 20205 September 20203
12SEKSARIA BUILDCON LLPSHANTIBAN SKYLARPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/MAA16212/151225/311229DHOLERA13 September 202515 December 20253
177 OAK DEVELOPERS PRIVATE LIMITEDPLATINUM 9PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10275/060622Not stated in the record4 February 20226 June 20224
17PACIFICUS SUPERINFRA LLPPALM GREENS PLATINUM 2PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA09395/EX1/240326/311226Not stated in the record12 August 20211 December 20214
17Ruturajsinh Jagdishsinh Chudasama(Proprietor of Infinity Infracon )PARK VIEWPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10465/180722Not stated in the record1 April 202218 July 20224
207 OAK DEVELOPERSPlatinum 8PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA08209/170321Not stated in the record29 October 202017 March 20215
20AAIJI INFRASPACE(OPC)PRIVATE LIMITEDAAIJI RESIDENCY 477PR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PAA15497/110725/311229KADIPUR1 February 202511 July 20255
20DHOLERA MEGA CITY 771Dholera Megacity 771PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10217/200522Not stated in the record1 January 202220 May 20225
20SMART DHOLERA HOUSING PRIVATE LIMITEDPICCADILLY SQUARE IIPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PN36AA09936/210522KADIPUR23 December 202121 May 20225
24FIDATO BUILDCONFIDATO LUXURIA 3PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA08562/040621Not stated in the record29 October 20204 June 20217
25SMARTHOMES INFRASTRUCTRE PRIVATE LIMITEDABCD ENCLAVE IVPR/GJ/AHMEDABAD/DHANDHUKA/DSIRDA/PN70AA09970/080622BHADIYAD6 October 20218 June 20228
26FIDATO BUILDCONFidato LuxuriaPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07658/101120Dholera30 January 202010 November 20209
26Ruturajsinh Jagdishsinh Chudasama(Proprietor of Infinity Infracon )Dholera Megacity IrisPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10133/020522Not stated in the record12 August 20212 May 20229
26SATYAJA INFRATECHBLISS 107PR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PAA12751/040124/310328KADIPUR1 April 20234 January 20249
29SATYAJA INFRACONBLISS GRANDEUR- 1PR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PAA12734/030124/310328KADIPUR1 March 20233 January 202410
29SATYAJA INFRACONBLISS GRANDEUR- 2PR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PAA12719/211223/310328KADIPUR1 March 202321 December 202310
31GREENERA INFRAWELL PRIVATE LIMITEDGREENERA PRIME 1PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07785/161220Kadipur1 January 202016 December 202011
31SATYAJA INFRATECHPRELUDE INDUSTRIAL PARKPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/PAA12807/240124/310328AMBLI1 March 202324 January 202411
33FIDATO BUILDCONFIDATO LUXURIA 2PR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA09239/271021Not stated in the record29 October 202027 October 202112

All 33 registered projects have both dates (0 dropped for a missing date). Months are the days between the two dates divided by 30.44, rounded. Shortest gap first; ties share a rank. Read on 2026-11-17.

Download this table (CSV). Last checked 17 November 2026. Free to quote with a link to this page.

Months between declared project start date and GujRERA registration date, read 17 November 2026
7 OAK PLATINUM 42
AAIJI RESIDENCY2
DHOLERA MARIGOLD 5482
DHOLERA SKY2
NEST 632
GAP Industrial Park 12
Aakar2
GREENERA GARDENVILLA 22
GREENERA PRIME 22
SHANTIBAN DREAMS2
Dholera Iconic2
7 OAK SMART CITY3
PLATINUM 73
NEST 293
GREENERA GARDENVILLA3

Bars show the first 15 rows, shortest gap first.

1. 7 OAK DEVELOPERS, 7 OAK PLATINUM 4

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07741/051220
  • VillageKadipur ( Dholera )
  • Project start date3 October 2020
  • Registration date5 December 2020
  • Gap2 months

The record gives a project start date of 3 October 2020 and a registration date of 5 December 2020, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

2. AAIJI INFRA AND DEVELOPERS, AAIJI RESIDENCY

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/AUDA/PAA09145/111021
  • VillageNot stated in the record
  • Project start date24 August 2021
  • Registration date11 October 2021
  • Gap2 months

The record gives a project start date of 24 August 2021 and a registration date of 11 October 2021, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

3. Bhaveshkumar C. Hakani Proprietor of C T CORPORATION, DHOLERA MARIGOLD 548

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07648/091120
  • VillageKadipur
  • Project start date19 September 2020
  • Registration date9 November 2020
  • Gap2 months

The record gives a project start date of 19 September 2020 and a registration date of 9 November 2020, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

4. CHHABILDAS DEVELOPERS PRIVATE LIMITED, DHOLERA SKY

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07924/160121
  • VillageNot stated in the record
  • Project start date5 November 2020
  • Registration date16 January 2021
  • Gap2 months

The record gives a project start date of 5 November 2020 and a registration date of 16 January 2021, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

5. CUBE INFRASTRUCTURE, NEST 63

  • GujRERA numberPR/GJ/AHMEDABAD/AHMEDABAD CITY/Others/PAA10662/150922
  • VillageNot stated in the record
  • Project start date15 July 2022
  • Registration date15 September 2022
  • Gap2 months

The record gives a project start date of 15 July 2022 and a registration date of 15 September 2022, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

6. GAP ASSOCIATES PRIVATE LIMITED, GAP Industrial Park 1

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA10173/EX1/030826/311226
  • VillageNot stated in the record
  • Project start date14 March 2022
  • Registration date11 May 2022
  • Gap2 months

The record gives a project start date of 14 March 2022 and a registration date of 11 May 2022, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

7. GAP STUDIOS LLP, Aakar

  • GujRERA numberPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/RAA15713/190825/311228
  • VillageBhimtalav
  • Project start date17 June 2025
  • Registration date19 August 2025
  • Gap2 months

The record gives a project start date of 17 June 2025 and a registration date of 19 August 2025, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

8. GREENERA INFRAWELL PRIVATE LIMITED, GREENERA GARDENVILLA 2

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA11450/EX1/010925/300526
  • VillageNot stated in the record
  • Project start date17 January 2023
  • Registration date14 March 2023
  • Gap2 months

The record gives a project start date of 17 January 2023 and a registration date of 14 March 2023, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

9. GREENERA INFRAWELL PRIVATE LIMITED, GREENERA PRIME 2

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07841/311220
  • VillageKadipur
  • Project start date6 November 2020
  • Registration date31 December 2020
  • Gap2 months

The record gives a project start date of 6 November 2020 and a registration date of 31 December 2020, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

10. PARV INFRACON LLP, SHANTIBAN DREAMS

  • GujRERA numberPR/GJ/AHMEDABAD/AHMEDABAD CITY/Dholera Special Investment Region Development Authority/MAA11736/A1M/281026/311228
  • VillageDHOLERA
  • Project start date2 March 2023
  • Registration date8 May 2023
  • Gap2 months

The record gives a project start date of 2 March 2023 and a registration date of 8 May 2023, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

11. Shyam Infra, Dholera Iconic

  • GujRERA numberPR/GJ/AHMEDABAD/DHOLERA/DSIRDA/CAA16655/010426/310330
  • VillageMundi
  • Project start date2 February 2026
  • Registration date1 April 2026
  • Gap2 months

The record gives a project start date of 2 February 2026 and a registration date of 1 April 2026, a gap of 2 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

12. 7 OAK DEVELOPERS, 7 OAK SMART CITY

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07929/180121
  • VillageNot stated in the record
  • Project start date29 October 2020
  • Registration date18 January 2021
  • Gap3 months

The record gives a project start date of 29 October 2020 and a registration date of 18 January 2021, a gap of 3 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

13. 7 OAK DEVELOPERS, PLATINUM 7

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA08002/030221
  • VillageNot stated in the record
  • Project start date5 November 2020
  • Registration date3 February 2021
  • Gap3 months

The record gives a project start date of 5 November 2020 and a registration date of 3 February 2021, a gap of 3 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

14. CUBE INFRA, NEST 29

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/AUDA/PAA07781/161220
  • VillageDholera
  • Project start date28 September 2020
  • Registration date16 December 2020
  • Gap3 months

The record gives a project start date of 28 September 2020 and a registration date of 16 December 2020, a gap of 3 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

15. GREENERA INFRAWELL PRIVATE LIMITED, GREENERA GARDENVILLA

  • GujRERA numberPR/GJ/AHMEDABAD/DHANDHUKA/Others/PAA07425/EX1/EX2/220825/301225
  • VillageBhimtalav
  • Project start date1 June 2020
  • Registration date5 September 2020
  • Gap3 months

The record gives a project start date of 1 June 2020 and a registration date of 5 September 2020, a gap of 3 months. The registration date is the approval date on the GujRERA record.

The start date is the one the promoter entered for the project. A gap does not show when sales began or when work began on site, and the register does not explain it.

Why I looked at this gap

Every project on the register carries two dates a buyer can read: the start date the promoter declared and the date the Authority approved the registration. Most pages about Dholera developers use neither. The gap between them is a fact anyone can check, and it is a better question to ask a seller than how many people have already booked. The gap is the builder's or developer's own declared start date set against the Authority's approval date.

This page records the gap and nothing more. The register does not say why a gap is two months or twelve, and I do not guess.

How to read the gap

The gap is counted from the project start date to the registration date. Across the 33 projects it runs from 2 to 12 months with a median of 4 months. 16 projects have a gap of three months or less and 8 have a gap of nine months or more.

The start date is the one the promoter entered. It can mean the date a layout was planned, a land parcel was assembled or work was started, and the record does not say which. The registration date is the date the project was approved on the register. A gap is therefore a pointer to a question, not an answer.

How to check the two dates yourself in five minutes

  1. Open gujrera.gujarat.gov.in and search the project name as printed in the table.
  2. Open the project's detail page and note the project start date.
  3. On the same record find the registration or approval date.
  4. Check that the registration number matches the one in the table.
  5. If you are being sold a plot, ask the seller which registration number covers it and compare its approval date with the date on your booking papers.

What the register can and cannot show

The register shows that a project is registered and when. A buyer who books before the registration date has no registration to point to on the day of booking, and the same record is where to check the date. The register does not show who sold what to whom, so the gap by itself says nothing about any sale.

The 33 registered projects are only part of the plotted and built supply near Dholera. A project that is not registered has no start date or registration date on this register and is not in the table.

What this list cannot tell you

This list cannot tell you when sales began, when work started on the ground or why a gap is long or short. The start date is entered by the promoter, and the register shows only the registered projects. A short gap is not a sign of quality and a long one is not a sign of a problem.

Questions people ask

How long after a Dholera project starts is it registered with GujRERA?

On the register read on 17 November 2026, the gap between the declared start date and the registration date runs from 2 to 12 months across 33 projects, with a median of 4 months. 16 projects were registered within three months of their declared start date. The start date is entered by the promoter.

Which Dholera project was registered fastest after its start date?

Several are tied at two months, including 7 Oak Platinum 4, Aaiji Residency, Aakar, Dholera Iconic, Dholera Marigold 548, Dholera Sky, GAP Industrial Park 1, Nest 63 and Shantiban Dreams. The table above lists every tie in alphabetical order by promoter name.

What does the project start date on a RERA record mean?

It is the start date the promoter declares for the project when applying. It may reflect planning, land assembly or the start of work, and the record does not say which. For that reason this page shows the date and the gap and does not interpret either.

Should I buy a plot before or after the project is registered?

Check the registration first. GujRERA shows the registration number and the approval date, and a promoter should be able to name the number covering your plot. If the number is not on the register or the approval date is after your booking date, ask the seller to explain in writing before you pay.

Is the gap between start and registration a reason to avoid a project?

No. The register does not say why a gap exists, and the table covers only registered projects. Use a long gap as a prompt to read the record and ask the developer about it, and check the title and the registered area for the exact plot as you would for any other project.

Read next

Sources

  1. GujRERA public register, Dholera project records (start and registration dates) (read 17 November 2026)
  2. GujRERA public project API, example record 10840 (7 Oak Platinum 4) (read 17 November 2026)
  3. GujRERA public project API, example record 27645 (Aakar) (read 17 November 2026)