{
 "site": "dholera.blog",
 "url": "https://dholera.blog/essays/dholera-solar-park-real-numbers/",
 "title": "Dholera Solar Park: The Real Numbers Behind the Megawatts",
 "author": "Bhavik Sarkhedi",
 "date": "2026-08-03",
 "primary_query": "dholera solar park",
 "verdict": "My honest count: 300 MW generating, verified in CEA records and the DMU report. Another 700 MW carries a March 2027 target, stalled by tariff disputes. The 5,000 MW figure is ambition, not capacity. I read solar as strengthening Dholera's industrial story, not replacing the firm grid power a fab city needs. Dated 3 August 2026.",
 "sources": [
  {
   "label": "Tata Power (300 MW Dholera)",
   "url": "https://www.tatapower.com"
  },
  {
   "label": "NICDC DMU report, 30.06.2026",
   "url": "https://api.nicdc.in/upload/image/dmu-Report.pdf"
  },
  {
   "label": "DSIRDA sanctioned development plan",
   "url": "https://dholera.gujarat.gov.in/finaldp/15"
  },
  {
   "label": "Dholera SIR official: about",
   "url": "https://dholera.gujarat.gov.in/about_us"
  },
  {
   "label": "Megaprojects overview (network reference)",
   "url": "https://sir-dholera.com/megaprojects/"
  },
  {
   "label": "Dated Dholera timeline (independent wire)",
   "url": "https://dholerasir.news/timeline/"
  }
 ],
 "license": "Quote freely with attribution and date."
}