 "site": "dholera.blog",
 "url": "https://dholera.blog/essays/dholera-electricity-and-power/",
 "title": "Dholera power supply: why firm beats green for a fab",
 "author": "Bhavik Sarkhedi",
 "date": "2026-08-03",
 "primary_query": "dholera power supply",
 "verdict": "The electrical build is the most credible thing here: transmission into the region, three 66 kV substations, roughly 115 km of buried duct, trunk works recorded complete on 30 June 2026. Nobody has published reliability under load, substation headroom, or the fab's demand. Solar is the story people repeat; firmness is the one that decides. Dated 3 August 2026.",
 "sources": [
  {
   "label": "NICDC DMU report, 30.06.2026",
   "url": "https://api.nicdc.in/upload/image/dmu-Report.pdf"
  },
  {
   "label": "DSIRDA sanctioned development plan",
   "url": "https://dholera.gujarat.gov.in/finaldp/15"
  },
  {
   "label": "Dholera SIR official: about",
   "url": "https://dholera.gujarat.gov.in/about_us"
  },
  {
   "label": "GIDB: activation area",
   "url": "https://gidb.org/activationareadsir"
  },
  {
   "label": "Tata Power (300 MW Dholera)",
   "url": "https://www.tatapower.com"
  },
  {
   "label": "Tata Electronics newsroom",
   "url": "https://www.tataelectronics.com"
  },
  {
   "label": "Dated Dholera timeline (independent wire)",
   "url": "https://dholerasir.news/timeline/"
  }
 ],
 "license": "Quote freely with attribution and date."
}